Pages that link to "Item:Q421579"
From MaRDI portal
The following pages link to Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers (Q421579):
Displaying 29 items.
- An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem (Q296973) (← links)
- An integer programming approach to the multimode resource-constrained multiproject scheduling problem (Q310345) (← links)
- Bi-objective multi-mode project scheduling under risk aversion (Q319785) (← links)
- An approach using SAT solvers for the RCPSP with logical constraints (Q321002) (← links)
- Multimode preemptive resource investment problem subject to due dates for activities: formulation and solution procedure (Q471724) (← links)
- Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies (Q526633) (← links)
- A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints (Q1628053) (← links)
- Multi-mode resource availability cost problem with recruitment and release dates for resources (Q1634132) (← links)
- A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem (Q1651597) (← links)
- A branch and bound algorithm for project scheduling problem with spatial resource constraints (Q1666182) (← links)
- Multi-attribute assignment of trains to departures in rolling stock management. Multi-attribute assignment of trains to departures in rolling stock management. A contribution to the EURO/ROADEF 2014 challenge (Q1730603) (← links)
- A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem (Q1752254) (← links)
- Resource-constrained project scheduling with activity splitting and setup times (Q2003582) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances (Q2256244) (← links)
- Stochastic project scheduling with hierarchical alternatives (Q2295321) (← links)
- A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem (Q2355885) (← links)
- Energetic reasoning for energy-constrained scheduling with a continuous resource (Q2356117) (← links)
- Integrated multi-project planning and scheduling -- a multiagent approach (Q2672092) (← links)
- A modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splitting (Q2798120) (← links)
- Resource-Constrained Scheduling with Non-constant Capacity and Non-regular Activities (Q3133907) (← links)
- An innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrains (Q5244304) (← links)
- Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristic (Q6088236) (← links)
- A clustering‐based review on project portfolio optimization methods (Q6092507) (← links)
- A data-driven \textit{meta}-learning recommendation model for multi-mode resource constrained project scheduling problem (Q6106590) (← links)
- Resource-constrained multi-project scheduling problem: a survey (Q6112820) (← links)
- A genetic algorithm for the resource-constrained project scheduling problem with alternative subgraphs using a Boolean satisfiability solver (Q6565426) (← links)
- Large neighborhood search for an aeronautical assembly line time-constrained scheduling problem with multiple modes and a resource leveling objective (Q6588462) (← links)
- An efficient relax-and-solve method for the multi-mode resource constrained project scheduling problem (Q6588464) (← links)