Pages that link to "Item:Q4230209"
From MaRDI portal
The following pages link to Scheduling research in multiple resource constrained job shops: a review and critique (Q4230209):
Displaying 7 items.
- Allocating job-shop manpower to minimize \(L_{\max}\): optimality criteria, search heuristics, and probabilistic quality metrics (Q336577) (← links)
- An effective lower bound on \(L_{\max}\) in a worker-constrained job shop (Q339585) (← links)
- Mass customization in videotape duplication and conversion: challenges of flexible duplication systems, fast delivery, and electronic service (Q850876) (← links)
- Scheduling of design projects with uncertain number of iterations (Q1124816) (← links)
- Resource-constrained project scheduling: A survey of recent developments. (Q1406618) (← links)
- Optimal and heuristic solutions for a scheduling problem arising in a foundry (Q1772868) (← links)
- Cross-training workers in Dual Resource Constrained systems with heterogeneous processing times (Q3055255) (← links)