The following pages link to (Q4287985):
Displaying 10 items.
- Scheduling with batch setup times and earliness-tardiness penalties (Q1278527) (← links)
- Scheduling about a common due date with job-dependent asymmetric earlines and tardiness penalties (Q1278719) (← links)
- A survey of the state-of-the-art of common due date assignment and scheduling research (Q1600949) (← links)
- A column generation based decomposition algorithm for a parallel machine just-in-time scheduling problem (Q1610145) (← links)
- Minimizing total completion time and total deviation of job completion times from a restrictive due-date (Q1776951) (← links)
- Simultaneous minimization of total completion time and total deviation of job completion times (Q1877049) (← links)
- Greedy heuristics for single-machine scheduling problems with general earliness and tardiness costs (Q1892102) (← links)
- Single machine scheduling to minimize the number of early and tardy jobs (Q1919786) (← links)
- A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems (Q2102995) (← links)
- Hierarchical minimization of completion time variance and makespan in jobshops (Q2496030) (← links)