Pages that link to "Item:Q4398900"
From MaRDI portal
The following pages link to A hierarchical bicriterion approach to integrated process plan selection and job shop scheduling (Q4398900):
Displayed 10 items.
- A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling. (Q1413813) (← links)
- Exploiting process plan flexibility in production scheduling: A multi-objective approach (Q1809824) (← links)
- Scheduling continuous casting of aluminum using a multiple objective ant colony optimization metaheuristic (Q1848643) (← links)
- Metaheuristics: A bibliography (Q1919858) (← links)
- A resource constrained scheduling problem with multiple independent producers and a single linking constraint: a coal supply chain example (Q2514747) (← links)
- Modelling and heuristics of FMS scheduling with multiple objectives (Q2566932) (← links)
- Modeling the planning and scheduling across the outsourcing supply chain: a Chaos-based fast Tabu–SA approach (Q3498924) (← links)
- GA-based adaptive setup planning toward process planning and scheduling integration (Q3636762) (← links)
- A framework for integration of production management issues and concurrent engineering (Q4363390) (← links)
- Integration of Process Planning and Scheduling with Sequence Dependent Setup Time: A Case Study from Electrical Wires and Power Cable Industry (Q5357761) (← links)