Pages that link to "Item:Q4398975"
From MaRDI portal
The following pages link to A dynamic forecasting model for job shop flowtime prediction and tardiness control (Q4398975):
Displaying 10 items.
- A GA-based NN approach for makespan estimation (Q872351) (← links)
- Lead time selection and the behaviour of work flow in job shops (Q1296700) (← links)
- Job shop leadtime requirements under conditions of controlled delivery performance (Q1333534) (← links)
- Makespan estimation in batch process industries: A comparison between regression analysis and neural networks (Q1869422) (← links)
- New approaches to due date assignment in job shops (Q2426556) (← links)
- Manufacturing lead time estimation using data mining (Q2496089) (← links)
- Dynamic job shop scheduling for missed due date performance (Q3055352) (← links)
- Multi-agent-based workload control for make-to-order manufacturing (Q3533191) (← links)
- An integrated system for controlling shop loading and work flow (Q4399087) (← links)
- A study of simple rules for subcontracting in make-to-order manufacturing (Q5925860) (← links)