Pages that link to "Item:Q4427328"
From MaRDI portal
The following pages link to Selecting Scheduling Heuristics Using Neural Networks (Q4427328):
Displayed 8 items.
- An improved migrating birds optimisation for a hybrid flowshop scheduling with total flowtime minimisation (Q506145) (← links)
- Architecture of manufacturing scheduling systems: literature review and an integrated proposal (Q976436) (← links)
- Two-stage three-machine assembly scheduling problem with sum-of-processing-times-based learning effect (Q2152905) (← links)
- The hybrid flow shop scheduling problem (Q2270289) (← links)
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective (Q2379653) (← links)
- Employee turnover: a neural network solution (Q2387284) (← links)
- Flowshop scheduling research after five decades (Q2572844) (← links)
- A branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardiness (Q4666773) (← links)