Pages that link to "Item:Q4474695"
From MaRDI portal
The following pages link to Optimization of the machining economics problem for a multistage transfer machine under failure, opportunistic and integrated replacement strategies (Q4474695):
Displayed 8 items.
- Just-in-time scheduling with controllable processing times on parallel machines (Q975765) (← links)
- Optimal due date assignment and resource allocation in a group technology scheduling environment (Q991385) (← links)
- Scheduling a batching machine with convex resource consumption functions (Q1944176) (← links)
- A survey of scheduling with controllable processing times (Q2381529) (← links)
- Scheduling to Maximize the Number of Just-in-Time Jobs: A Survey (Q2958665) (← links)
- Optimization of a machining economics model with fuzzy exponents and coefficients (Q3527924) (← links)
- Machining conditions-based preventive maintenance (Q5438645) (← links)
- Real-time health prognosis and dynamic preventive maintenance policy for equipment under aging Markovian deterioration (Q5438671) (← links)