Pages that link to "Item:Q4661112"
From MaRDI portal
The following pages link to Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms (Q4661112):
Displayed 7 items.
- Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting (Q859913) (← links)
- Scheduling projects with heterogeneous resources to meet time and quality objectives (Q954926) (← links)
- Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics (Q1776952) (← links)
- Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting (Q2432851) (← links)
- Project selection, scheduling and resource allocation with time dependent returns (Q2519075) (← links)
- A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling (Q2519076) (← links)
- A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility (Q2572852) (← links)