Pages that link to "Item:Q4671355"
From MaRDI portal
The following pages link to Sequencing problem for a mixed-model assembly line in the Toyota production system (Q4671355):
Displayed 7 items.
- A scatter search based hyper-heuristic for sequencing a mixed-model assembly line (Q604932) (← links)
- Sequencing mixed-model assembly lines: survey, classification and model critique (Q1011163) (← links)
- Models for MMSP-W considering workstation dependencies: a case study of Nissan's Barcelona plant (Q2253383) (← links)
- Output Rate Variation Problem: Some Heuristic Paradigms and Dynamic Programming (Q2974712) (← links)
- Optimal production sequencing problem to minimise line stoppage time in a mixed-model assembly line (Q3019223) (← links)
- Level schedules for mixed-model JIT production lines: characteristics of the largest instances that can be solved optimally (Q5385396) (← links)
- Production smoothing in just-in-time manufacturing systems: a review of the models and solution approaches (Q5385397) (← links)