Pages that link to "Item:Q4740322"
From MaRDI portal
The following pages link to Preselective strategies for the optimization of stochastic project networks under resource constraints (Q4740322):
Displaying 33 items.
- A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations (Q309061) (← links)
- Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming (Q319710) (← links)
- Bi-objective multi-mode project scheduling under risk aversion (Q319785) (← links)
- A pure proactive scheduling algorithm for multiple Earth observation satellites under uncertainties of clouds (Q342441) (← links)
- A min-flow algorithm for minimal critical set detection in resource constrained project scheduling (Q456733) (← links)
- New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing (Q539456) (← links)
- Efficient priority rules for the stochastic resource-constrained project scheduling problem (Q724000) (← links)
- A classification of predictive-reactive project scheduling procedures (Q835548) (← links)
- A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept (Q852940) (← links)
- Scheduling of project networks (Q908839) (← links)
- Schedule-induced posets (Q1081529) (← links)
- New strategies for stochastic resource-constrained project scheduling (Q1617288) (← links)
- Branch and bound algorithms for resource constrained project scheduling problem subject to nonrenewable resources with prescheduled procurement (Q1718808) (← links)
- Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem (Q1730711) (← links)
- The preemptive stochastic resource-constrained project scheduling problem (Q1735185) (← links)
- Maximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedure (Q1754200) (← links)
- On the generation of circuits and minimal forbidden sets (Q1769072) (← links)
- Project scheduling under uncertainty: survey and research potentials (Q1772834) (← links)
- Minimum-cost diagnostic strategies for \(k\)-out-of-\(n\) systems with imperfect tests (Q1786885) (← links)
- Resource-constrained project scheduling: Notation, classification, models, and methods (Q1806880) (← links)
- Stochastic task networks -- trading performance for stability (Q2011606) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- An approximate dynamic programming approach to project scheduling with uncertain resource availabilities (Q2247268) (← links)
- Scheduling Markovian PERT networks to maximize the net present value (Q2270324) (← links)
- The proactive and reactive resource-constrained project scheduling problem (Q2281615) (← links)
- Minimizing the expected makespan of a project with stochastic activity durations under resource constraints (Q2356119) (← links)
- A Boolean satisfiability approach to the resource-constrained project scheduling problem (Q2430594) (← links)
- Project planning with alternative technologies in uncertain environments (Q2630099) (← links)
- A compact reformulation of the two-stage robust resource-constrained project scheduling problem (Q2668660) (← links)
- Resource allocation by means of project networks: Dominance results (Q3113507) (← links)
- Resource allocation by means of project networks: Complexity results (Q3113509) (← links)
- Stochastic scheduling problems I — General strategies (Q3216419) (← links)
- Stochastic scheduling problems II-set strategies- (Q3685553) (← links)