Pages that link to "Item:Q4814095"
From MaRDI portal
The following pages link to Scheduling the production of rolling ingots: industrial context, model, and solution method (Q4814095):
Displayed 10 items.
- A flow-based tabu search algorithm for the RCPSP with transfer times (Q280159) (← links)
- Production scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithm (Q400054) (← links)
- Time symmetry of resource constrained project scheduling with general temporal constraints and take-give resources (Q513559) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- A computational study of exact approaches for the adjustable robust resource-constrained project scheduling problem (Q1654362) (← links)
- Double girder bridge crane with double cycling: scheduling strategy and performance evaluation (Q2336415) (← links)
- Managing and modelling general resource transfers in (multi-)project scheduling (Q2379662) (← links)
- On Eulerian extensions and their application to no-wait flowshop scheduling (Q2434285) (← links)
- GRASP and path relinking for project scheduling under partially renewable resources (Q2482792) (← links)
- A scatter search algorithm for project scheduling under partially renewable resources (Q2491335) (← links)