Pages that link to "Item:Q4823496"
From MaRDI portal
The following pages link to Solving the<i>n</i>-job 3-stage flexible flowshop scheduling problem using an agent-based approach (Q4823496):
Displayed 3 items.
- The hybrid flow shop scheduling problem (Q2270289) (← links)
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective (Q2379653) (← links)
- An Ant-bidding Algorithm for Multistage Flowshop Scheduling Problem: Optimization and Phase Transitions (Q3509420) (← links)