Pages that link to "Item:Q4826245"
From MaRDI portal
The following pages link to A tabu search heuristic for scheduling the production processes at an oil refinery (Q4826245):
Displayed 4 items.
- Shipment planning at oil refineries using column generation and valid inequalities (Q706854) (← links)
- Multi-stage simultaneous lot-sizing and scheduling for flow line production (Q1936588) (← links)
- Modeling industrial lot sizing problems: a review (Q5385468) (← links)
- Lot sizing with bounded inventory and lost sales (Q5451189) (← links)