Pages that link to "Item:Q4835449"
From MaRDI portal
The following pages link to Scheduling <i>n</i> Independent Jobs on <i>m</i> Uniform Machines with both Flowtime and Makespan Objectives: A Parametric Analysis (Q4835449):
Displayed 9 items.
- Two-agent scheduling on uniform parallel machines with min-max criteria (Q744634) (← links)
- Optimal preemptive scheduling on uniform machines with discounted flowtime objectives (Q856258) (← links)
- On the existence of schedules that are near-optimal for both makespan and total weighted completion time (Q1375117) (← links)
- Generating outpatient chemotherapy appointment templates with balanced flowtime and makespan (Q1711478) (← links)
- Best compromise solution for a new multiobjective scheduling problem (Q2489291) (← links)
- The constrained minimum weighted sum of job completion times problem (Q2494511) (← links)
- Multicriteria scheduling (Q2566699) (← links)
- Multicriteria scheduling problems: a survey (Q2773166) (← links)
- Counting and enumeration complexity with application to multicriteria scheduling (Q5920490) (← links)