The following pages link to Single Machine Scheduling to Minimize Total Weighted Late Work (Q4896450):
Displaying 25 items.
- Polynomial time approximation scheme for two parallel machines scheduling with a common due date to maximize early work (Q1673940) (← links)
- Scheduling on parallel identical machines with late work criterion: offline and online cases (Q1702733) (← links)
- Minimizing total weighted late work in the resource-constrained project scheduling problem (Q1792320) (← links)
- Two-agent preemptive Pareto-scheduling to minimize the number of tardy jobs and total late work (Q2025084) (← links)
- Minimizing total late work on a single machine with generalized due-dates (Q2030324) (← links)
- Single-machine Pareto-scheduling with multiple weighting vectors for minimizing the total weighted late works (Q2083387) (← links)
- A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems (Q2102995) (← links)
- Pareto-scheduling of two competing agents with their own equal processing times (Q2140187) (← links)
- Minimizing total weighted late work on a single-machine with non-availability intervals (Q2165284) (← links)
- A survey of due-date related single-machine with two-agent scheduling problem (Q2190270) (← links)
- Single-machine scheduling with multi-agents to minimize total weighted late work (Q2197329) (← links)
- Two competitive agents to minimize the weighted total late work and the total completion time (Q2243272) (← links)
- On the approximability of the two-phase knapsack problem (Q2279756) (← links)
- Fully polynomial time approximation scheme to maximize early work on parallel machines with common due date (Q2301935) (← links)
- Two-agent scheduling problems on a single-machine to minimize the total weighted late work (Q2359798) (← links)
- Approximation algorithms for minimizing the total weighted tardiness on a single machine (Q2368997) (← links)
- Metaheuristic approaches for the two-machine flow-shop problem with weighted late work criterion and common due date (Q2384909) (← links)
- A note on a two-agent scheduling problem related to the total weighted late work (Q2424661) (← links)
- Single machine scheduling with common assignable due date/due window to minimize total weighted early and late work (Q2673557) (← links)
- A Parallel Machine Scheduling Problem Maximizing Total Weighted Early Work (Q5024913) (← links)
- Bicriterion Pareto‐scheduling of equal‐length jobs on a single machine related to the total weighted late work (Q6057022) (← links)
- A no-delay single machine scheduling problem to minimize total weighted early and late work (Q6063508) (← links)
- Pareto‐optimization of three‐agent scheduling to minimize the total weighted completion time, weighted number of tardy jobs, and total weighted late work (Q6076476) (← links)
- Pareto‐scheduling with double‐weighted jobs to minimize the weighted number of tardy jobs and total weighted late work (Q6077487) (← links)
- A new perspective on single-machine scheduling problems with late work related criteria (Q6160955) (← links)