Pages that link to "Item:Q497626"
From MaRDI portal
The following pages link to General flowshop scheduling problem with the sequence dependent setup times: a heuristic approach (Q497626):
Displayed 5 items.
- The third comprehensive survey on scheduling problems with setup times/costs (Q319774) (← links)
- An improved migrating birds optimisation for a hybrid flowshop scheduling with total flowtime minimisation (Q506145) (← links)
- Enhanced migrating birds optimization algorithm for the permutation flow shop problem with sequence dependent setup times (Q1694317) (← links)
- An evolution strategy approach for the distributed permutation flowshop scheduling problem with sequence-dependent setup times (Q2146995) (← links)
- No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan (Q2284308) (← links)