Pages that link to "Item:Q5059220"
From MaRDI portal
The following pages link to Joint optimization of preventive maintenance and flexible flowshop sequence-dependent group scheduling considering multiple setups (Q5059220):
Displaying 8 items.
- Production, maintenance and resource scheduling: a review (Q2098022) (← links)
- Joint optimization of production scheduling and group preventive maintenance planning in multi-machine systems (Q2675651) (← links)
- Proportionate flowshop scheduling with position-dependent weights (Q5059283) (← links)
- Due-window assignment scheduling problems with position-dependent weights on a single machine (Q5059296) (← links)
- Evolutionary job scheduling with optimized population by deep reinforcement learning (Q6048525) (← links)
- Algorithms to minimize total completion time in a two-machine flowshop problem with uncertain set-up times (Q6094376) (← links)
- An asymmetric traveling salesman problem based matheuristic algorithm for flowshop group scheduling problem (Q6113360) (← links)
- Predictive Maintenance and Upgrade Scheduling for Production Line under Multi-period Product-service Paradigm (Q6151474) (← links)