Pages that link to "Item:Q5059417"
From MaRDI portal
The following pages link to Solving distributed two-stage hybrid flowshop scheduling using a shuffled frog-leaping algorithm with memeplex grouping (Q5059417):
Displaying 5 items.
- Effective constructive heuristics for distributed no-wait flexible flow shop scheduling problem (Q2669577) (← links)
- Meta-Lamarckian-based iterated greedy for optimizing distributed two-stage assembly flowshops with mixed setups (Q6099438) (← links)
- A systematic review of multi-objective hybrid flow shop scheduling (Q6112731) (← links)
- Improved shuffled frog leaping algorithm with unsupervised population partitioning strategies for complex optimization problems (Q6123386) (← links)
- A discrete group teaching optimization algorithm for solving many-objective sand casting whole process production scheduling problem (Q6551183) (← links)