Pages that link to "Item:Q5144773"
From MaRDI portal
The following pages link to Production Scheduling for Strategic Open Pit Mine Planning: A Mixed-Integer Programming Approach (Q5144773):
Displaying 6 items.
- A framework for adaptive open-pit mining planning under geological uncertainty (Q2138292) (← links)
- A recursive time aggregation-disaggregation heuristic for the multidimensional and multiperiod precedence-constrained knapsack problem: an application to the open-pit mine block sequencing problem (Q2160495) (← links)
- Solution procedures for block selection and sequencing in flat-bedded potash underground mines (Q2241902) (← links)
- Constructing branching trees of geostatistical simulations (Q2676486) (← links)
- Optimization Strategies for Resource-Constrained Project Scheduling Problems in Underground Mining (Q5060783) (← links)
- A real-world mine excavators timetabling methodology in open-pit mining (Q6050355) (← links)