Pages that link to "Item:Q5168038"
From MaRDI portal
The following pages link to A new order splitting model with stochastic lead times for deterioration items (Q5168038):
Displayed 4 items.
- A continuous review, \((Q, r)\) inventory model for a deteriorating item with random demand and positive lead time (Q2003569) (← links)
- Typology and literature review on multiple supplier inventory control models (Q2030495) (← links)
- An integrated economic disposal and lot-sizing problem for perishable inventories with batch production and corrupt stock-dependent holding cost (Q2171384) (← links)
- An order-splitting model for supplier selection and order allocation in a multi-echelon supply chain (Q2669622) (← links)