Pages that link to "Item:Q534872"
From MaRDI portal
The following pages link to Hybrid flowshop scheduling with machine and resource-dependent processing times (Q534872):
Displaying 11 items.
- The third comprehensive survey on scheduling problems with setup times/costs (Q319774) (← links)
- Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption (Q320777) (← links)
- Optimizing of bullwhip effect and net stock amplification in three-echelon supply chains using evolutionary multi-objective metaheuristics (Q324324) (← links)
- Bi-objective integrating sustainable order allocation and sustainable supply chain network strategic design with stochastic demand using a novel robust hybrid multi-objective metaheuristic (Q337636) (← links)
- Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates (Q1630186) (← links)
- Group-shop scheduling with sequence-dependent set-up and transportation times (Q1634110) (← links)
- Solving multi-objective parallel machine scheduling problem by a modified NSGA-II (Q1788959) (← links)
- A branch and bound algorithm for hybrid flow shop scheduling problem with setup time and assembly operations (Q1991311) (← links)
- A simulation-optimization model for solving flexible flow shop scheduling problems with rework and transportation (Q1998264) (← links)
- Designing a sustainable supply chain network integrated with vehicle routing: a comparison of hybrid swarm intelligence metaheuristics (Q2002867) (← links)
- A comprehensive risk assessment view on interval type-2 fuzzy controller for a time-dependent HazMat routing problem (Q2098039) (← links)