Pages that link to "Item:Q5426586"
From MaRDI portal
The following pages link to Influence of capacity- and time-constrained intermediate storage in two-stage food production systems (Q5426586):
Displaying 6 items.
- Integrating deterioration and lifetime constraints in production and supply chain planning: a survey (Q296854) (← links)
- A discrete time exact solution approach for a complex hybrid flow-shop scheduling problem with limited-wait constraints (Q1762015) (← links)
- Planning and scheduling of the make-and-pack dairy production under lifetime uncertainty (Q2294752) (← links)
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective (Q2379653) (← links)
- Dynamic production control in a serial line with process queue time constraint (Q3163252) (← links)
- Make to stock and mix to order: choosing intermediate products in the food-processing industry (Q3163270) (← links)