Pages that link to "Item:Q5444459"
From MaRDI portal
The following pages link to Cyclic job scheduling in paced assembly lines with cross-trained workers (Q5444459):
Displaying 3 items.
- Minimizing the number of workers in a paced mixed-model assembly line (Q1991120) (← links)
- A comparative study on three graph-based constructive algorithms for multi-stage scheduling with blocking (Q2423281) (← links)
- An effective formulation for optimal scheduling of multistage multi-product batch plant based on due dates (Q3163750) (← links)