Pages that link to "Item:Q545969"
From MaRDI portal
The following pages link to Bounding strategies for the hybrid flow shop scheduling problem (Q545969):
Displaying 3 items.
- Machine scheduling in underground mining: an application in the potash industry (Q280169) (← links)
- Iterated search methods for earliness and tardiness minimization in hybrid flowshops with due windows (Q1652188) (← links)
- Automatic algorithm design for hybrid flowshop scheduling problems (Q2286868) (← links)