Pages that link to "Item:Q5478844"
From MaRDI portal
The following pages link to An agent-based negotiation approach to integrate process planning and scheduling (Q5478844):
Displaying 9 items.
- Parallel machines scheduling with machine preference via agent-based approach (Q272606) (← links)
- An object-coding genetic algorithm for integrated process planning and scheduling (Q319374) (← links)
- An enhanced genetic algorithm with an innovative encoding strategy for flexible job-shop scheduling with operation and processing flexibility (Q2244251) (← links)
- Solving integrated process planning, dynamic scheduling, and due date assignment using metaheuristic algorithms (Q2298093) (← links)
- Reducing tardy jobs by integrating process planning and scheduling functions (Q3055274) (← links)
- Optimisation of integrated process planning and scheduling using a particle swarm optimisation approach (Q3055373) (← links)
- r-FrMS: a relation-driven fractal organisation for distributed manufacturing systems (Q3055657) (← links)
- A multi-agent protocol for multilateral negotiations in supply chain management (Q3163797) (← links)
- Integrated process planning and scheduling/rescheduling—an agent-based approach (Q5385345) (← links)