Pages that link to "Item:Q552221"
From MaRDI portal
The following pages link to A heuristic approach for a scheduling problem with periodic maintenance and sequence-dependent setup times (Q552221):
Displaying 6 items.
- The third comprehensive survey on scheduling problems with setup times/costs (Q319774) (← links)
- Flow shop batching and scheduling with sequence-dependent setup times (Q490328) (← links)
- Exact solution of the single-machine scheduling problem with periodic maintenances and sequence-dependent setup times (Q1754111) (← links)
- Heuristic methods for the single-machine scheduling problem with periodical resource constraints (Q1979180) (← links)
- Parallel machine scheduling with the total weighted delivery time performance measure in distributed manufacturing (Q2026991) (← links)
- Single batch machine scheduling with dual setup times for autoclave molding manufacturing (Q2668803) (← links)