Pages that link to "Item:Q553937"
From MaRDI portal
The following pages link to An integrated cost model for production scheduling and perfect maintenance (Q553937):
Displaying 2 items.
- A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines (Q892903) (← links)
- Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problem (Q2664314) (← links)