Pages that link to "Item:Q5900277"
From MaRDI portal
The following pages link to Integrated production planning and preventive maintenance in deteriorating production systems (Q5900277):
Displaying 4 items.
- A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines (Q892903) (← links)
- A novel solution approach with ML-based pseudo-cuts for the flight and maintenance planning problem (Q2241911) (← links)
- Joint Optimization of Production Plan and Preventive Maintenance Schedule by Stackelberg Game (Q5359052) (← links)
- Integrated production planning and preventive maintenance in deteriorating production systems (Q5892261) (← links)