Pages that link to "Item:Q5932026"
From MaRDI portal
The following pages link to NP-hardness of compact scheduling in simplified open and flow shops. (Q5932026):
Displayed 10 items.
- No-wait flexible flowshop scheduling with no-idle machines (Q813967) (← links)
- A survey of scheduling problems with no-wait in process (Q1751258) (← links)
- Chromatic scheduling in a cyclic open shop (Q1767677) (← links)
- A note on minimizing maximum lateness in a two-machine no-wait flowshop (Q1879796) (← links)
- A travelling salesman approach to solve the \(F\)/no-idle/\(C_{max}\) problem (Q1887766) (← links)
- The simple \(F2//C \max\) with forbidden tasks in first or last position: a problem more complex that it seems (Q1887767) (← links)
- Four decades of research on the open-shop scheduling problem to minimize the makespan (Q2239884) (← links)
- Coupled task scheduling with exact delays: literature review and models (Q2282490) (← links)
- No-idle, no-wait: when shop scheduling meets dominoes, Eulerian paths and Hamiltonian paths (Q2327957) (← links)
- On Eulerian extensions and their application to no-wait flowshop scheduling (Q2434285) (← links)