Pages that link to "Item:Q5937713"
From MaRDI portal
The following pages link to The use of advance demand information in a project-based supply chain (Q5937713):
Displaying 9 items.
- Modelling imperfect advance demand information and analysis of optimal inventory policies (Q856283) (← links)
- Improving supply-chain performance by sharing advance demand information (Q1847235) (← links)
- The repair kit problem with imperfect advance demand information (Q2171602) (← links)
- On the tradeoff between optimal order-base-stock levels and demand lead-times (Q2482825) (← links)
- A review of coordination studies in the context of supply chain dynamics (Q3163306) (← links)
- OPTIMAL PRODUCTION POLICIES WITH MULTISTAGE STOCHASTIC DEMAND LEAD TIMES (Q3183128) (← links)
- A heuristic methodology for order distribution in a demand driven collaborative supply chain (Q4474705) (← links)
- Production-inventory systems with imperfect advance demand information and updating (Q5392801) (← links)
- Distributed supply-chain project rescheduling: part II—distributed affected operations rescheduling algorithm (Q5478813) (← links)