Pages that link to "Item:Q5959377"
From MaRDI portal
The following pages link to Minimizing tardiness in a two-machine flow-shop (Q5959377):
Displaying 14 items.
- An assignment-based lower bound for a class of two-machine flow shop problems (Q336351) (← links)
- A high performing metaheuristic for multi-objective flowshop scheduling problem (Q337199) (← links)
- Tabu search for non-permutation flowshop scheduling problem with minimizing total tardiness (Q711284) (← links)
- A class of multi-objective expected value decision-making model with birandom coefficients and its application to flow shop scheduling problem (Q730912) (← links)
- A multi-objective particle swarm for a flow shop scheduling problem (Q867030) (← links)
- Minimising total tardiness in the \(m\)-machine flowshop problem: A review and evaluation of heuristics and metaheuristics (Q941559) (← links)
- Minimizing total tardiness on a two-machine re-entrant flowshop (Q1042154) (← links)
- A cooperative dispatching approach for minimizing mean tardiness in a dynamic flowshop (Q1762116) (← links)
- Two-machine flow shop total tardiness scheduling problem with deteriorating jobs (Q1930748) (← links)
- No-wait flow shop scheduling using fuzzy multi-objective linear programming (Q2271524) (← links)
- Note on minimizing total tardiness in a two-machine flowshop (Q2387308) (← links)
- A branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardiness (Q4666773) (← links)
- Minimising mean tardiness with alternative operations in two-machine flow-shop scheduling (Q5712093) (← links)
- Exact and metaheuristic algorithms for flow-shop scheduling problems with release dates (Q6094571) (← links)