Pages that link to "Item:Q602916"
From MaRDI portal
The following pages link to Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop (Q602916):
Displaying 6 items.
- Total completion time with makespan constraint in no-wait flowshops with setup times (Q296867) (← links)
- A robust two-machine flow-shop scheduling model with scenario-dependent processing times (Q782088) (← links)
- Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures (Q1622791) (← links)
- Minimizing the makespan for a two-stage three-machine assembly flow shop problem with the sum-of-processing-time based learning effect (Q1727266) (← links)
- Two-stage three-machine assembly scheduling problem with sum-of-processing-times-based learning effect (Q2152905) (← links)
- Two-stage assembly scheduling problem for minimizing total tardiness with setup times (Q2293429) (← links)