Pages that link to "Item:Q6076476"
From MaRDI portal
The following pages link to Pareto‐optimization of three‐agent scheduling to minimize the total weighted completion time, weighted number of tardy jobs, and total weighted late work (Q6076476):
Displaying 5 items.
- Two-agent preemptive Pareto-scheduling to minimize the number of tardy jobs and total late work (Q2025084) (← links)
- Single-machine Pareto-scheduling with multiple weighting vectors for minimizing the total weighted late works (Q2083387) (← links)
- Pareto-scheduling of two competing agents with their own equal processing times (Q2140187) (← links)
- Bicriterion Pareto‐scheduling of equal‐length jobs on a single machine related to the total weighted late work (Q6057022) (← links)
- Pareto‐scheduling with double‐weighted jobs to minimize the weighted number of tardy jobs and total weighted late work (Q6077487) (← links)