Pages that link to "Item:Q612208"
From MaRDI portal
The following pages link to Minimizing total weighted completion time with uncertain data: a stability approach (Q612208):
Displaying 5 items.
- Single machine scheduling problem with interval processing times to minimize mean weighted completion time (Q337133) (← links)
- The robust (minmax regret) single machine scheduling with interval processing times and total weighted completion time objective (Q342174) (← links)
- Optimality region for job permutation in single-machine scheduling with uncertain processing times (Q827990) (← links)
- Stability polyhedra of optimal permutation of jobs servicing (Q893928) (← links)
- A polynomial time heuristic for the two-machine flowshop scheduling problem with setup times and random processing times (Q1789013) (← links)