Pages that link to "Item:Q613357"
From MaRDI portal
The following pages link to An exact solution procedure for multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse (Q613357):
Displaying 6 items.
- Approximation analysis of multi-class closed queueing maintenance networks with a parts inventory system and two-phase Coxian time distributions (Q336986) (← links)
- A multi-class closed queueing maintenance network model with a parts inventory system (Q716352) (← links)
- A typology and literature review on stochastic multi-echelon inventory models (Q1749506) (← links)
- Heuristics for multi-item two-echelon spare parts inventory control subject to aggregate and individual service measures (Q1752179) (← links)
- Integrated scheduling and batch ordering for construction project (Q1991384) (← links)
- Joint optimization of location and allocation for spare parts depots under \((r,Q)\) inventory policy (Q6647097) (← links)