Pages that link to "Item:Q614053"
From MaRDI portal
The following pages link to Minimization of maximum lateness on parallel machines with sequence-dependent setup times and job release dates (Q614053):
Displaying 9 items.
- An iterated greedy algorithm for the large-scale unrelated parallel machines scheduling problem (Q336380) (← links)
- ABC-based manufacturing scheduling for unrelated parallel machines with machine-dependent and job sequence-dependent setup times (Q337126) (← links)
- A three-stage optimization algorithm for the stochastic parallel machine scheduling problem with adjustable production rates (Q1956018) (← links)
- A two-stage solution approach for plastic injection machines scheduling problem (Q1983688) (← links)
- Tabu-enhanced iterated greedy algorithm: a case study in the quadratic multiple knapsack problem (Q2255966) (← links)
- Iterated greedy for the maximum diversity problem (Q2275623) (← links)
- MIP models and a matheuristic algorithm for an identical parallel machine scheduling problem under multiple copies of shared resources constraints (Q2421327) (← links)
- Minimizing shifts for personnel task scheduling problems: a three-phase algorithm (Q2514834) (← links)
- A simulation‐based differential evolution algorithm for stochastic parallel machine scheduling with operational considerations (Q5416762) (← links)