Pages that link to "Item:Q622160"
From MaRDI portal
The following pages link to Minimizing total completion time in two-stage hybrid flow shop with dedicated machines (Q622160):
Displaying 3 items.
- A two-stage hybrid flow shop with dedicated machines at the first stage (Q336642) (← links)
- A heuristic method for two-stage hybrid flow shop with dedicated machines (Q339604) (← links)
- Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines (Q1651647) (← links)