Pages that link to "Item:Q628308"
From MaRDI portal
The following pages link to Properties of optimal schedules in preemptive shop scheduling (Q628308):
Displaying 14 items.
- Multimode preemptive resource investment problem subject to due dates for activities: formulation and solution procedure (Q471724) (← links)
- Synchronous flow shop scheduling with pliable jobs (Q723997) (← links)
- On some properties of optimal schedules in the job shop problem with preemption and an arbitrary regular criterion (Q744655) (← links)
- Arc-B-consistency of the inter-distance constraint (Q879973) (← links)
- The complexity of mean flow time scheduling problems with release times (Q880590) (← links)
- Energy-efficient scheduling and routing via randomized rounding (Q1617291) (← links)
- Normal-form preemption sequences for an open problem in scheduling theory (Q1702732) (← links)
- Integer preemptive scheduling on parallel machines (Q1939681) (← links)
- Four decades of research on the open-shop scheduling problem to minimize the makespan (Q2239884) (← links)
- Resource constrained project scheduling subject to due dates: preemption permitted with penalty (Q2248711) (← links)
- How small are shifts required in optimal preemptive schedules? (Q2341389) (← links)
- A complete 4-parametric complexity classification of short shop scheduling problems (Q2434295) (← links)
- Integrality Property in Preemptive Parallel Machine Scheduling (Q3392940) (← links)
- Logic-based Benders decomposition for the preemptive flexible job-shop scheduling problem (Q6164353) (← links)