Pages that link to "Item:Q632662"
From MaRDI portal
The following pages link to Combined planning and scheduling in a divergent production system with co-production: a case study in the lumber industry (Q632662):
Displaying 5 items.
- An exact optimization approach for an integrated process configuration, lot-sizing, and scheduling problem (Q1634095) (← links)
- Parallel machine scheduling with time constraints on machine qualifications (Q1738819) (← links)
- Matheuristic for the decentralized factories scheduling problem (Q2290271) (← links)
- A branch-and-price algorithm for parallel machine campaign planning under sequence dependent family setups and co-production (Q2669527) (← links)
- Essay on Conceptual Modeling, Analysis and Illustration of Agent-Based Simulations for Distributed Supply Chain Planning (Q6160353) (← links)