Pages that link to "Item:Q656606"
From MaRDI portal
The following pages link to Scheduling with job-dependent learning effects and multiple rate-modifying activities (Q656606):
Displaying 30 items.
- Scheduling a deteriorating maintenance activity and due-window assignment (Q337476) (← links)
- Single-machine scheduling with learning and forgetting effects (Q358103) (← links)
- Single-machine scheduling with deteriorating jobs and aging effects under an optional maintenance activity consideration (Q385474) (← links)
- Scheduling on parallel identical machines with job-rejection and position-dependent processing times (Q456108) (← links)
- Single-machine scheduling with piece-rate maintenance and interval constrained position-dependent processing times (Q505770) (← links)
- Scheduling with job-rejection and position-dependent processing times on proportionate flowshops (Q523188) (← links)
- Due-window assignment and scheduling with multiple rate-modifying activities under the effects of deterioration and learning (Q541440) (← links)
- Parallel machine scheduling with a deteriorating maintenance activity and total absolute differences penalties (Q548379) (← links)
- Single-machine scheduling problems with both start-time dependent learning and position dependent aging effects under deteriorating maintenance consideration (Q613268) (← links)
- Scheduling deteriorating jobs with a learning effect on unrelated parallel machines (Q1634126) (← links)
- Single-machine group scheduling problems with variable job processing times (Q1666514) (← links)
- Single machine scheduling with resource allocation and learning effect considering the rate-modifying activity (Q1667833) (← links)
- Multi-machine scheduling with interval constrained position-dependent processing times (Q1716992) (← links)
- A note: minimizing total absolute deviation of job completion times on unrelated machines with general position-dependent processing times and job-rejection (Q1730596) (← links)
- Unrelated parallel-machine scheduling with aging effects and multi-maintenance activities (Q1762135) (← links)
- Solving a two-agent single-machine scheduling problem considering learning effect (Q1762153) (← links)
- Multitasking scheduling problems with deterioration effect (Q1992785) (← links)
- Production, maintenance and resource scheduling: a review (Q2098022) (← links)
- Effects of OCRA parameters and learning rate on machine scheduling (Q2155133) (← links)
- On scheduling a deteriorating rate-modifying activity to minimize the number of tardy jobs (Q2176833) (← links)
- Unrelated parallel-machine scheduling problems with multiple rate-modifying activities (Q2446459) (← links)
- Multi-machine scheduling with general position-based deterioration to minimize total load revisited (Q2448108) (← links)
- Scheduling problem in seru production system considering DeJong's learning effect and job splitting (Q2673820) (← links)
- Scheduling with Deteriorating Jobs and Non-Simultaneous Machine Available Times (Q2788530) (← links)
- SCHEDULING POSITION-BASED DETERIORATING JOBS WITH MULTIPLE RATE-MODIFYING ACTIVITIES AND PAST-SEQUENCE-DEPENDENT DELIVERY TIMES (Q2875636) (← links)
- SINGLE MACHINE SCHEDULING WITH A LEARNING EFFECT AND A RATE-MODIFYING ACTIVITY (Q3174015) (← links)
- Genetic Algorithm for a Two-Agent Scheduling Problem with Truncated Learning Consideration (Q5174416) (← links)
- COMMON DUE-WINDOW ASSIGNMENT AND SCHEDULING OF JOB-DEPENDENT DETERIORATING JOBS AND MULTIPLE DETERIORATING MAINTENANCE ACTIVITIES (Q5411729) (← links)
- Multitasking scheduling with multiple rate‐modifying activities (Q6066633) (← links)
- A short note on ``A note on single-machine scheduling with job-dependent learning effects'' (Q6072206) (← links)