Pages that link to "Item:Q660815"
From MaRDI portal
The following pages link to A note on optimization in deteriorating systems using scheduling problems with the aging effect and resource allocation models (Q660815):
Displaying 14 items.
- Exact and parallel metaheuristic algorithms for the single processor total weighted completion time scheduling problem with the sum-of-processing-time based models (Q336999) (← links)
- Group scheduling with deteriorating jobs to minimize the total weighted number of late jobs (Q440780) (← links)
- Module-based architecture for a periodic job-shop scheduling problem (Q692211) (← links)
- Unrelated parallel-machine scheduling with deterioration effects and deteriorating multi-maintenance activities for minimizing the total completion time (Q727300) (← links)
- Total tardiness minimization in permutation flowshop with deterioration consideration (Q1630777) (← links)
- Scheduling problems with position dependent job processing times: computational complexity results (Q1761835) (← links)
- Single machine resource allocation scheduling problems with deterioration effect and general positional effect (Q1981261) (← links)
- Uniform parallel machine scheduling with resource consumption constraint (Q2009726) (← links)
- Single machine batch scheduling problem to minimize makespan with controllable setup and jobs processing times (Q2340165) (← links)
- Single-machine scheduling with accelerating deterioration effects (Q2448137) (← links)
- Unrelated Parallel-Machine Scheduling with Controllable Processing Times and Impact of Deteriorating Maintenance Activities under Consideration (Q2800800) (← links)
- A note ‘On a single machine-scheduling problem with separated position and resource effects’ (Q2808333) (← links)
- A note on resource allocation scheduling with position-dependent workloads (Q5058801) (← links)
- On a single machine-scheduling problem with separated position and resource effects (Q5248210) (← links)