Pages that link to "Item:Q721682"
From MaRDI portal
The following pages link to Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems (Q721682):
Displaying 36 items.
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- Theoretical aspects of multicriteria flight gate scheduling: Deterministic and fuzzy models (Q983626) (← links)
- Simulated annealing and tabu search for multi-mode project payment scheduling (Q1042041) (← links)
- Activity list representation for a generalization of the resource-constrained project scheduling problem (Q1042097) (← links)
- A comparison of stochastic scheduling rules for maximizing project net present value (Q1127130) (← links)
- Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem (Q1129955) (← links)
- An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations (Q1265850) (← links)
- A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes (Q1266549) (← links)
- A framework for an interactive project scheduling system under limited resources (Q1266550) (← links)
- Project network models with discounted cash flows a guided tour through recent developments (Q1278075) (← links)
- A genetic algorithm for multi-mode resource constrained project scheduling problem (Q1278080) (← links)
- PSPLIB -- a project scheduling problem library (Q1278481) (← links)
- Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application (Q1291582) (← links)
- A model to optimize project resource allocation by construction of a balanced histogram (Q1291687) (← links)
- The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure (Q1296080) (← links)
- Interactive analysis of multiple-criteria project scheduling problems (Q1296090) (← links)
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm (Q1296105) (← links)
- Constrained multi-project planning problems: A Lagrangean decomposition approach (Q1342015) (← links)
- DSS for multiobjective project scheduling (Q1342057) (← links)
- A local constraint based analysis approach to project scheduling under general resource constraints (Q1342067) (← links)
- A flexible heuristic for a multi-mode capital constrained project scheduling problem with probabilistic cash inflows (Q1373161) (← links)
- Resource-constrained project scheduling: A survey of recent developments. (Q1406618) (← links)
- An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode case (Q1681264) (← links)
- Resource-constrained project scheduling: Notation, classification, models, and methods (Q1806880) (← links)
- The multi-mode resource-constrained project scheduling problem with generalized precedence relations (Q1807061) (← links)
- Progress payments in project scheduling problems. (Q1812008) (← links)
- Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling (Q1909005) (← links)
- Solving the resource constrained project scheduling problem with optimization subroutine library (Q1919788) (← links)
- A robust optimization approach for the multi-mode resource-constrained project scheduling problem (Q2030698) (← links)
- A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem (Q2270291) (← links)
- Scheduling a project to maximize its net present value: An integer programming approach (Q2366079) (← links)
- Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach (Q2366088) (← links)
- Hierarchical models for multi-project planning and scheduling (Q2366089) (← links)
- Bicriteria train scheduling for high-speed passenger railroad planning applications (Q2566708) (← links)
- Resource-constrained project scheduling by simulated annealing (Q4230228) (← links)
- A constraint-based perspective in resource constrained project scheduling (Q4394226) (← links)