Pages that link to "Item:Q726222"
From MaRDI portal
The following pages link to Scheduling to minimize the maximum total completion time per machine (Q726222):
Displaying 4 items.
- Primary-secondary bicriteria scheduling on identical machines to minimize the total completion time of all jobs and the maximum T-time of all machines (Q391787) (← links)
- Notes on a hierarchical scheduling problem on identical machines (Q506158) (← links)
- A lower bound for minimizing the total completion time of a three-agent scheduling problem (Q1671716) (← links)
- Revisit of the scheduling problems with integrated production and delivery on parallel batching machines (Q2039677) (← links)