Pages that link to "Item:Q726392"
From MaRDI portal
The following pages link to Single machine batch scheduling to minimize the sum of total flow time and batch delivery cost with an unavailability interval (Q726392):
Displayed 5 items.
- Scheduling two parallel machines with machine-dependent availabilities (Q342363) (← links)
- A knowledge-based approach for multi-factory production systems (Q1652022) (← links)
- Scheduling jobs with maintenance subject to load-dependent duration on a single machine (Q1664968) (← links)
- Single-machine scheduling with workload-dependent maintenance duration to minimize maximum lateness (Q1666458) (← links)
- Integrated production and delivery scheduling on a serial batch machine to minimize the makespan (Q2257290) (← links)