The following pages link to Preemptive scheduling of independent jobs on parallel machines subject to financial constraints (Q791440):
Displaying 24 items.
- Approximability of scheduling problems with resource consuming jobs (Q256641) (← links)
- Approximation schemes for single machine scheduling with non-renewable resource constraints (Q398908) (← links)
- Reductions between scheduling problems with non-renewable resources and knapsack problems (Q482287) (← links)
- Single machine scheduling problems with financial resource constraints: some complexity results and properties (Q554491) (← links)
- Production scheduling problems in a textile industry (Q1194728) (← links)
- Polynomial algorithms for single machine scheduling problems with financial constraints (Q1371954) (← links)
- Lower bounds for the event scheduling problem with consumption and production of resources (Q1686062) (← links)
- Approximation schemes for parallel machine scheduling with non-renewable resources (Q1698888) (← links)
- A PTAS for a resource scheduling problem with arbitrary number of parallel machines (Q1728364) (← links)
- Optimal resource profiles for program scheduling (Q1821025) (← links)
- A tight approximation ratio of a list scheduling algorithm for a single-machine scheduling problem with a non-renewable resource (Q2059081) (← links)
- New complexity and approximability results for minimizing the total weighted completion time on a single machine subject to non-renewable resource constraints (Q2078845) (← links)
- EPTAS for load balancing problem on parallel machines with a non-renewable resource (Q2085740) (← links)
- Minimizing makespan on a single machine with release dates and inventory constraints (Q2184096) (← links)
- Minimizing total weighted completion time on a single machine subject to non-renewable resource constraints (Q2294889) (← links)
- Stochastic scheduling to minimize expected maximum lateness (Q2482822) (← links)
- Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problem (Q2664314) (← links)
- Mathematical Modeling of Scheduling Problems (Q3354456) (← links)
- Preemptive scheduling with staircase and piecewise linear resource availability (Q3830806) (← links)
- Scheduling unit-time tasks in renewable resource constrained flowshops (Q4031376) (← links)
- Solving a bicriteria scheduling problem on unrelated parallel machines occurring in the glass bottle industry (Q5954825) (← links)
- EPTAS for load balancing problem on parallel machines with a non-renewable resource (Q6108926) (← links)
- A multivariate complexity analysis of the material consumption scheduling problem (Q6136081) (← links)
- Scheduling with non-renewable resources: minimizing the sum of completion times (Q6547136) (← links)