Pages that link to "Item:Q818091"
From MaRDI portal
The following pages link to Optimal models for a multi-stage supply chain system controlled by kanban under just-in-time philosophy (Q818091):
Displaying 11 items.
- Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers (Q958558) (← links)
- Selection of a pull production control policy under different demand situations for a manufacturing system by AHP-algorithm (Q959507) (← links)
- Determination of number of kanbans in a supply chain system via memetic algorithm (Q1009927) (← links)
- Supply chain models for an assembly system with preprocessing of raw materials: a simple and better algorithm (Q1789477) (← links)
- A genetic algorithm for optimizing defective goods supply chain costs using JIT logistics and each-cycle lengths (Q1994471) (← links)
- A seasonal demand inventory model with variable lead time and resource constraints (Q2643395) (← links)
- Stochastic analysis of TPS: expose and eliminate variability by highly specifying WCP (Q3012642) (← links)
- A hybrid GA-simulation approach to improve JIT systems (Q3163344) (← links)
- An on-time delivery improvement model for manufacturing organisations (Q3163349) (← links)
- A mixed 0‐1 integer programming for inventory model (Q3639299) (← links)
- Determining the optimal number of Kanban in multi-products supply chain system (Q5494692) (← links)