Pages that link to "Item:Q835585"
From MaRDI portal
The following pages link to Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities (Q835585):
Displaying 26 items.
- A genetic algorithm for the robust resource leveling problem (Q283265) (← links)
- Simplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithm (Q444285) (← links)
- Applying local rescheduling in response to schedule disruptions (Q613784) (← links)
- A heuristic approach for resource constrained project scheduling with uncertain activity durations (Q632677) (← links)
- A mathematical model for the management of a service center (Q636490) (← links)
- Time slack-based techniques for robust project scheduling subject to resource uncertainty (Q646671) (← links)
- Reactive scheduling in the multi-mode RCPSP (Q709110) (← links)
- Bi-level multiple mode resource-constrained project scheduling problems under hybrid uncertainty (Q747027) (← links)
- Resilience analysis for project scheduling with renewable resource constraint and uncertain activity durations (Q747041) (← links)
- Robust berth scheduling with uncertain vessel delay and handling time (Q763208) (← links)
- Robust execution strategies for project scheduling with unreliable resources and stochastic durations (Q906557) (← links)
- Operating room planning and scheduling: a literature review (Q1038356) (← links)
- A hybrid simulation-optimization approach for the robust discrete time/cost trade-off problem (Q1636886) (← links)
- Robust scheduling for berth allocation and quay crane assignment problem (Q1719234) (← links)
- Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem (Q1730711) (← links)
- A robust optimization approach for the multi-mode resource-constrained project scheduling problem (Q2030698) (← links)
- Generating a robust baseline schedule for the robust discrete time/resource trade-off problem under work content uncertainty (Q2147061) (← links)
- An approximate dynamic programming approach to project scheduling with uncertain resource availabilities (Q2247268) (← links)
- Proactive policies for the stochastic resource-constrained project scheduling problem (Q2275822) (← links)
- Proactive and reactive strategies for football league timetabling (Q2282571) (← links)
- Evolutionary algorithms for multi-objective stochastic resource availability cost problem (Q2656542) (← links)
- The Interaction Between Critical Chain Sequencing, Buffer Sizing, and Reactive Actions in a CC/BM Framework (Q5223040) (← links)
- Evaluation of a new decision-aid parameter for job shop scheduling under uncertainties (Q5242361) (← links)
- Tabu search for proactive project scheduling problem with flexible resources (Q6164385) (← links)
- Minimizing the expected renewable resource costs in a project with stochastic resource availability (Q6561570) (← links)
- A branch-and-bound algorithm for the proactive resource-constrained project scheduling problem with a robustness maximization objective (Q6568412) (← links)