Pages that link to "Item:Q838180"
From MaRDI portal
The following pages link to A hybrid two-stage transportation and batch scheduling problem (Q838180):
Displaying 8 items.
- Using genetic algorithms for the coordinated scheduling problem of a batching machine and two-stage transportation (Q555434) (← links)
- A polling-based dynamic order-picking system considering priority orders (Q2205307) (← links)
- New results on the coordination of transportation and batching scheduling (Q2290566) (← links)
- Realistic two-stage flowshop batch scheduling problems with transportation capacity and times (Q2428924) (← links)
- Effective heuristics for makespan minimization in parallel batch machines with non-identical capacities and job release times (Q2628197) (← links)
- Integrated Scheduling of Production and Two-Stage Delivery of Make-to-Order Products: Offline and Online Algorithms (Q5139609) (← links)
- Bicriteria Scheduling on a Single Batching Machine with Transportation and Deterioration to Minimize Total Completion Time and Production Costs (Q5348802) (← links)
- An efficient algorithm for two-stage capacitated time minimization transportation problem with restricted flow (Q6593949) (← links)