Pages that link to "Item:Q852940"
From MaRDI portal
The following pages link to A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept (Q852940):
Displaying 3 items.
- A heuristic approach for resource constrained project scheduling with uncertain activity durations (Q632677) (← links)
- Structured construction and simulation of nondeterministic stochastic activity networks (Q1027622) (← links)
- A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags (Q1736833) (← links)