Pages that link to "Item:Q852993"
From MaRDI portal
The following pages link to Using aggregation to optimize long-term production planning at an underground mine (Q852993):
Displaying 6 items.
- Machine scheduling in underground mining: an application in the potash industry (Q280169) (← links)
- Optimization-based heuristics for underground mine scheduling (Q299816) (← links)
- Runtime reduction techniques for the probabilistic traveling salesman problem with deadlines (Q958456) (← links)
- A study of the Bienstock-Zuckerberg algorithm: applications in mining and resource constrained project scheduling (Q1744895) (← links)
- Optimizing the open pit-to-underground mining transition (Q1752806) (← links)
- Optimizing a mineral value chain with market uncertainty using Benders decomposition (Q1755250) (← links)